Customization: | Available |
---|---|
Nominal Voltage: | 48V |
Warranty: | 10 Years |
Still deciding? Get samples of US$ 700/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Moudle: HYLV-100-A | |||||||
Specification | |||||||
Nominal Capacity(kWh) | 5.12 | 10.24 | 15.36 | 20.48 | 25.6 | 30.72 | |
Number of moudles | 1 | 2 | 3 | 4 | 5 | 6 | |
Size (Length*Width*Height mm) | 600*240*320 | 600*240*620 | 600*240*920 | 600*240*1220 | 600*240*1520 | 600*240*1820 | |
Net Weight (kg) | 52±2kg( Single Moudle) | ||||||
General Information | |||||||
Battery Moudle | LiFePO4 | ||||||
Rated Voltage(V) | 51.2 | ||||||
Operating Voltage Range(V) | 44.8-58.4 | ||||||
Rated Capacity(Ah) | 100 | ||||||
Depth of Discharge | 95% | ||||||
Max Charge/Discharge Current(A) | 100 | ||||||
Peak Discharge Current(A) | 200A@30s | ||||||
Working Temperature | Charge: 0-50ºC Discharge: -10-50ºC |
||||||
Storage Temperature (Optimum Temperature) | -20-55ºC(15ºC~35ºC) | ||||||
Communication | RS485/CAN/RS223 | ||||||
Humidity | 10%-85%(No Condensing ) | ||||||
Height Level | ≤2000m | ||||||
Cycle Times | ≥6000,25ºC | ||||||
Protection class | IP21/IP65(Option) | ||||||
Warranty | 5years /10 years(Option) | ||||||
Certification | |||||||
Functional Safety(CB) | IEC 62619:2022 | ||||||
Battery Compatible(CE) | EN IEC61000-6-1:2019 EN IEC61000-6-1:2021 |
||||||
Transport | UN38.3, MSDS |
Founded in 2020, Jiangsu Huayou Energy Technology Co., Ltd. is a high-tech enterprise jointly initiated by Zhejiang Huayou Cycle Technology Co., LTD., a wholly-owned subsidiary of Zhejiang Huayou Cobalt Co., LTD. (Stock code :603799), Toyota Tsusho (China) Co., LTD., China Merchants Group and China Electric Automobile 100 People's Association. The company is committed to the exploration and realization of the value chain of the full life cycle of dynamic power lithium batteries, and through the development of cloud platform battery data detection technology, core energy control system technology and product creation, innovative operation model practice, and the construction of energy big data network operation platform, is committed to becoming a leading smart energy network solution provider. Ensure clean, safe, economical and efficient energy supply!
1. Can I have samples to test? And what is lead time?
Yes, we can supply samples, the lead time for samples is 7 days, and buyer pay for sample cost and shipping cost. Some are in stock and can be delivered at any time.
2. What kind of certificates do you have?
We can provide CE, ROHS, FCC, IEC62133, MSDS, UN38.3, ISO9001 etc.
3.Are you battery real capacity?
All of our battery cells with Grade A,100% new and real capacity. We promise 100% Top grade A. If you found it is not A battery cell, you can contact us for refund.
4.Can I print my LOGO on it?
YES, LOGO/sticker/OEM/ODM welcomed.
5.What is your after-sales service?
We provide 7*24h online support.
6. Payment details?
* Pay through T/T, Western Union, PayPal…
*Price term: FOB Shenzhen port, CFR, CIF.
*The customer is responsible for any tax or bank charges by their country.
*T/T 30% as deposit, T/T 70% before shipment, other payment terms can be discussed according to the order quantity.
7.Do you have MOQ ?
No limited. Small order also welcome.More quantity has better price, we will check the best price for you.